Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.
Hlavní autor: | |
---|---|
Médium: | Variation order |
Jazyk: | English |
Vydáno: |
Brac University
2023
|
Témata: | |
On-line přístup: | http://hdl.handle.net/10361/21102 |