Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Auteur principal: | |
---|---|
Format: | Drawings |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/21018 |
id |
10361-21018 |
---|---|
record_format |
dspace |
spelling |
10361-210182023-09-19T21:03:42Z Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B) BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project Architectural drawings Architectural designs Contractor shop drawing Y-column Painting works Color code This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings. 2023-09-19T06:53:57Z 2023-09-19T06:53:57Z ©2023 2023-02-07 Drawings Ref. no.: RFA-560-B http://hdl.handle.net/10361/21018 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 11 pages application/pdf Brac University |
institution |
Brac University |
collection |
Institutional Repository |
language |
English |
topic |
New campus project Architectural drawings Architectural designs Contractor shop drawing Y-column Painting works Color code |
spellingShingle |
New campus project Architectural drawings Architectural designs Contractor shop drawing Y-column Painting works Color code BUCG-ABC Joint Venture (BUCG-ABC JV) Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B) |
description |
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings. |
format |
Drawings |
author |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
author_facet |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
author_sort |
BUCG-ABC Joint Venture (BUCG-ABC JV) |
title |
Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B) |
title_short |
Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B) |
title_full |
Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B) |
title_fullStr |
Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B) |
title_full_unstemmed |
Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B) |
title_sort |
technical specification of 3f and 9f top steel beam, 4f and 5f y column paint as top coat and field test report (rfa-560_rev.b) |
publisher |
Brac University |
publishDate |
2023 |
url |
http://hdl.handle.net/10361/21018 |
work_keys_str_mv |
AT bucgabcjointventurebucgabcjv technicalspecificationof3fand9ftopsteelbeam4fand5fycolumnpaintastopcoatandfieldtestreportrfa560revb |
_version_ |
1814306887963770880 |