Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)

This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.

Bibliographic Details
Main Author: BUCG-ABC Joint Venture (BUCG-ABC JV)
Format: Drawings
Language:English
Published: Brac University 2023
Subjects:
Online Access:http://hdl.handle.net/10361/21018