Cut-off ditch in the south of utility building of BRAC University new campus project
This record contains as-built drawing of RCC (Reinforced Cement Concrete) structure of Brac University New Campus Project. It consists of PDF & DWG version of drawings.
| 1. autor: | |
|---|---|
| Format: | Drawings |
| Język: | English |
| Wydane: |
Brac University
2023
|
| Hasła przedmiotowe: | |
| Dostęp online: | http://hdl.handle.net/10361/21641 |