Plumbing layout for basement-2 (utility building)
This record contains consultant drawings of plumbing of Brac University New Campus Project. It consists of only DWG version of drawings.
1. autor: | Electro-Mechanical Control Services (EMCS) |
---|---|
Format: | Drawings |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/21412 |
Podobne zapisy
-
Plumbing layout for basement-1 (utility building)
od: Electro-Mechanical Control Services (EMCS)
Wydane: (2023) -
Plumbing layout for basement-3 (utility building)
od: Electro-Mechanical Control Services (EMCS)
Wydane: (2023) -
Plumbing layout for basement-1 intermediate plan (utility building)
od: Electro-Mechanical Control Services (EMCS)
Wydane: (2023) -
Plumbing layout for 2nd storey plan (utility building)
od: Electro-Mechanical Control Services (EMCS)
Wydane: (2023) -
Plumbing layout for ground storey plan (utility building)
od: Electro-Mechanical Control Services (EMCS)
Wydane: (2023)