Cut-Off ditch in the south of utility building (RFA-312_Rev A)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of both PDF and DWG version of drawings.
| Main Authors: | , , |
|---|---|
| Format: | Drawings |
| Language: | English |
| Published: |
Brac University
2023
|
| Subjects: | |
| Online Access: | http://hdl.handle.net/10361/21258 |