Finish schedule detail (RFA-473_Rev.B)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Hoofdauteur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formaat: | Drawings |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/21241 |
Gelijkaardige items
-
Finish schedule detail (RFA-473_Rev B)
door: WOHA Designs PTE LTD, et al.
Gepubliceerd in: (2023) -
4F-6F architectural finishes (RFA-423_Rev B)
door: WOHA Designs PTE LTD, et al.
Gepubliceerd in: (2023) -
Basement finishes demarcation (RFA-407_Rev D)
door: WOHA Designs PTE LTD, et al.
Gepubliceerd in: (2023) -
Detail of prayer room (RFA-556_Rev.B)
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
4F-6F architectural finishes ( RFA-424_Rev A)
door: WOHA Designs PTE LTD, et al.
Gepubliceerd in: (2023)