Punch through concret slab for the condensate drain pipe for each HAHU of the calss room

This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.

Dettagli Bibliografici
Autore principale: BUCG-ABC Joint Venture (BUCG-ABC JV)
Natura: Variation order
Lingua:English
Pubblicazione: Brac University 2023
Soggetti:
Accesso online:http://hdl.handle.net/10361/21102