Punch through concret slab for the condensate drain pipe for each HAHU of the calss room

This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.

Sonraí bibleagrafaíochta
Príomhchruthaitheoir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Formáid: Variation order
Teanga:English
Foilsithe / Cruthaithe: Brac University 2023
Ábhair:
Rochtain ar líne:http://hdl.handle.net/10361/21102