Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.
Huvudupphovsman: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Materialtyp: | Variation order |
Språk: | English |
Publicerad: |
Brac University
2023
|
Ämnen: | |
Länkar: | http://hdl.handle.net/10361/21102 |
Liknande verk
-
Approval of rate for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom
av: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicerad: (2023) -
Purchase order for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom for BracU new campus project
av: Brac University
Publicerad: (2023) -
Purchase order for supply & installation of precast concrete slabs on the pedestals for the roof drainage of BRACU new campus project
av: Brac University
Publicerad: (2023) -
Observation regarding the concrete surface quality of roof slab & preparation of mock-up
av: Brac University
Publicerad: (2023) -
Missing of punches for MEP works in the concrete members (slab, beam & walls)
av: Brac University
Publicerad: (2023)