Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.
Главный автор: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Формат: | Variation order |
Язык: | English |
Опубликовано: |
Brac University
2023
|
Предметы: | |
Online-ссылка: | http://hdl.handle.net/10361/21102 |
Схожие документы
-
Approval of rate for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom
по: BUCG-ABC Joint Venture (BUCG-ABC JV)
Опубликовано: (2023) -
Purchase order for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom for BracU new campus project
по: Brac University
Опубликовано: (2023) -
Purchase order for supply & installation of precast concrete slabs on the pedestals for the roof drainage of BRACU new campus project
по: Brac University
Опубликовано: (2023) -
Observation regarding the concrete surface quality of roof slab & preparation of mock-up
по: Brac University
Опубликовано: (2023) -
Missing of punches for MEP works in the concrete members (slab, beam & walls)
по: Brac University
Опубликовано: (2023)