Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.
第一著者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
フォーマット: | Variation order |
言語: | English |
出版事項: |
Brac University
2023
|
主題: | |
オンライン・アクセス: | http://hdl.handle.net/10361/21102 |
類似資料
-
Approval of rate for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom
著者:: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版事項: (2023) -
Purchase order for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom for BracU new campus project
著者:: Brac University
出版事項: (2023) -
Purchase order for supply & installation of precast concrete slabs on the pedestals for the roof drainage of BRACU new campus project
著者:: Brac University
出版事項: (2023) -
Observation regarding the concrete surface quality of roof slab & preparation of mock-up
著者:: Brac University
出版事項: (2023) -
Missing of punches for MEP works in the concrete members (slab, beam & walls)