Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.
Autore principale: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Natura: | Variation order |
Lingua: | English |
Pubblicazione: |
Brac University
2023
|
Soggetti: | |
Accesso online: | http://hdl.handle.net/10361/21102 |
Documenti analoghi
-
Approval of rate for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom
di: BUCG-ABC Joint Venture (BUCG-ABC JV)
Pubblicazione: (2023) -
Purchase order for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom for BracU new campus project
di: Brac University
Pubblicazione: (2023) -
Purchase order for supply & installation of precast concrete slabs on the pedestals for the roof drainage of BRACU new campus project
di: Brac University
Pubblicazione: (2023) -
Observation regarding the concrete surface quality of roof slab & preparation of mock-up
di: Brac University
Pubblicazione: (2023) -
Missing of punches for MEP works in the concrete members (slab, beam & walls)
di: Brac University
Pubblicazione: (2023)