Punch through concret slab for the condensate drain pipe for each HAHU of the calss room

This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.

מידע ביבליוגרפי
מחבר ראשי: BUCG-ABC Joint Venture (BUCG-ABC JV)
פורמט: Variation order
שפה:English
יצא לאור: Brac University 2023
נושאים:
גישה מקוונת:http://hdl.handle.net/10361/21102

פריטים דומים