Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.
Κύριος συγγραφέας: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Μορφή: | Variation order |
Γλώσσα: | English |
Έκδοση: |
Brac University
2023
|
Θέματα: | |
Διαθέσιμο Online: | http://hdl.handle.net/10361/21102 |
Παρόμοια τεκμήρια
-
Approval of rate for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom
ανά: BUCG-ABC Joint Venture (BUCG-ABC JV)
Έκδοση: (2023) -
Purchase order for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom for BracU new campus project
ανά: Brac University
Έκδοση: (2023) -
Purchase order for supply & installation of precast concrete slabs on the pedestals for the roof drainage of BRACU new campus project
ανά: Brac University
Έκδοση: (2023) -
Observation regarding the concrete surface quality of roof slab & preparation of mock-up
ανά: Brac University
Έκδοση: (2023) -
Missing of punches for MEP works in the concrete members (slab, beam & walls)
ανά: Brac University
Έκδοση: (2023)