Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.
Hovedforfatter: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Variation order |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/21102 |
Lignende værker
-
Approval of rate for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023) -
Purchase order for punch through concrete slab for the condensate drain pipe for each HAHU of the classroom for BracU new campus project
af: Brac University
Udgivet: (2023) -
Purchase order for supply & installation of precast concrete slabs on the pedestals for the roof drainage of BRACU new campus project
af: Brac University
Udgivet: (2023) -
Observation regarding the concrete surface quality of roof slab & preparation of mock-up
af: Brac University
Udgivet: (2023) -
Missing of punches for MEP works in the concrete members (slab, beam & walls)
af: Brac University
Udgivet: (2023)