Punch through concret slab for the condensate drain pipe for each HAHU of the calss room

This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.

Bibliographic Details
Main Author: BUCG-ABC Joint Venture (BUCG-ABC JV)
Format: Variation order
Language:English
Published: Brac University 2023
Subjects:
Online Access:http://hdl.handle.net/10361/21102
id 10361-21102
record_format dspace
spelling 10361-211022023-10-08T10:08:16Z Punch through concret slab for the condensate drain pipe for each HAHU of the calss room BUCG-ABC Joint Venture (BUCG-ABC JV) New campus project Variation order BUCG-ABC Class room Concret slab Condensate drain pipe This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project. 2023-09-20T10:11:30Z 2023-09-20T10:11:30Z ©2022 2022-05-17 Variation order http://hdl.handle.net/10361/21102 en This document is protected by copyright. They may be viewed from this source for any purpose, but reproduction or distribution in any format is prohibited without written permission. 2 pages application/pdf Brac University
institution Brac University
collection Institutional Repository
language English
topic New campus project
Variation order
BUCG-ABC
Class room
Concret slab
Condensate drain pipe
spellingShingle New campus project
Variation order
BUCG-ABC
Class room
Concret slab
Condensate drain pipe
BUCG-ABC Joint Venture (BUCG-ABC JV)
Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
description This variation order has been made between Brac University and BUCG-ABC joint venture for Punch through concrete slab for the condensate drain pipe for each HAHU of the class room of Brac University new campus project.
format Variation order
author BUCG-ABC Joint Venture (BUCG-ABC JV)
author_facet BUCG-ABC Joint Venture (BUCG-ABC JV)
author_sort BUCG-ABC Joint Venture (BUCG-ABC JV)
title Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
title_short Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
title_full Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
title_fullStr Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
title_full_unstemmed Punch through concret slab for the condensate drain pipe for each HAHU of the calss room
title_sort punch through concret slab for the condensate drain pipe for each hahu of the calss room
publisher Brac University
publishDate 2023
url http://hdl.handle.net/10361/21102
work_keys_str_mv AT bucgabcjointventurebucgabcjv punchthroughconcretslabforthecondensatedrainpipeforeachhahuofthecalssroom
_version_ 1814308337448124416