Rebar welding at permanent caping in D-wall
This variation order has been made between Brac University and BUCG-ABC joint venture for rebar welding at permanent caping in D-wall of Brac University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | Variation order |
Lenguaje: | English |
Publicado: |
Brac University
2023
|
Materias: | |
Acceso en línea: | http://hdl.handle.net/10361/21087 |
Ejemplares similares
-
Rebar welding at permanent caping in D-wall
por: Brac University
Publicado: (2023) -
D-wall remedial work
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Approval of unit rates of non-schedule item 'Rebar Welding with Existing Rebar of D-Wall for Constructing Permanent Capping Beam'
por: Brac University
Publicado: (2023) -
Valuation of rebar connection via mechanical coupler
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023) -
Additional wall attached to diaphragm wall
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado: (2023)