Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | Drawings |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/21018 |
相似書籍
-
Color code and technical specification of portal frame column paint (RFA-495_Rev.B)
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
1F-2F RCC offset band (RFA-517_Rev.B)
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
4F-6F architectural finishes (RFA-423_Rev B)
由: WOHA Designs PTE LTD, et al.
出版: (2023) -
4F-6F architectural finishes ( RFA-424_Rev A)
由: WOHA Designs PTE LTD, et al.
出版: (2023) -
10F-12F Architectural finishes (RFA-425_Rev A)
由: WOHA Designs PTE LTD, et al.
出版: (2023)