Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
1. autor: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Drawings |
Język: | English |
Wydane: |
Brac University
2023
|
Hasła przedmiotowe: | |
Dostęp online: | http://hdl.handle.net/10361/21018 |
Podobne zapisy
-
Color code and technical specification of portal frame column paint (RFA-495_Rev.B)
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
1F-2F RCC offset band (RFA-517_Rev.B)
od: BUCG-ABC Joint Venture (BUCG-ABC JV)
Wydane: (2023) -
4F-6F architectural finishes (RFA-423_Rev B)
od: WOHA Designs PTE LTD, i wsp.
Wydane: (2023) -
4F-6F architectural finishes ( RFA-424_Rev A)
od: WOHA Designs PTE LTD, i wsp.
Wydane: (2023) -
10F-12F Architectural finishes (RFA-425_Rev A)
od: WOHA Designs PTE LTD, i wsp.
Wydane: (2023)