Technical specification of 3F and 9F top steel beam, 4F and 5F Y column paint as top coat and field test report (RFA-560_Rev.B)
This record contains architectural contractor shop drawings of Brac University New Campus Project. It consists of only PDF version of drawings.
Main Author: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Format: | Drawings |
Language: | English |
Published: |
Brac University
2023
|
Subjects: | |
Online Access: | http://hdl.handle.net/10361/21018 |
Similar Items
-
Color code and technical specification of portal frame column paint (RFA-495_Rev.B)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
1F-2F RCC offset band (RFA-517_Rev.B)
by: BUCG-ABC Joint Venture (BUCG-ABC JV)
Published: (2023) -
4F-6F architectural finishes (RFA-423_Rev B)
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
4F-6F architectural finishes ( RFA-424_Rev A)
by: WOHA Designs PTE LTD, et al.
Published: (2023) -
10F-12F Architectural finishes (RFA-425_Rev A)
by: WOHA Designs PTE LTD, et al.
Published: (2023)