Issue about finishing the floor works on 4th & 5th floor
This record consists of general correspondence regarding the issue about finishing the floor works on 4th & 5th floor of BRACU new campus building.
Hoofdauteur: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formaat: | General correspondence |
Taal: | English |
Gepubliceerd in: |
Brac University
2023
|
Onderwerpen: | |
Online toegang: | http://hdl.handle.net/10361/20742 |
Gelijkaardige items
-
5th floor decking slab
door: WOHA Designs PTE LTD, et al.
Gepubliceerd in: (2023) -
4th floor decking slab
door: WOHA Designs PTE LTD, et al.
Gepubliceerd in: (2023) -
Time extension of design change for 6th-8th floor
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Time extension of design change for 6th-8th floor
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023) -
Joint details between facade and floor finishes (classroom, 9th storey) (RFA-575_Rev.A)
door: BUCG-ABC Joint Venture (BUCG-ABC JV)
Gepubliceerd in: (2023)