Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project
This record consists of general correspondence regarding Project Manager's comment on adding drawings of elevator switch box and wiring tube of BRAC University new campus project.
Prif Awdur: | BUCG-ABC Joint Venture |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20493 |
Eitemau Tebyg
-
Regarding adding drawings of elevator switch box and wiring tube of BRAC University new campus project
gan: BUCG-ABC Joint Venture
Cyhoeddwyd: (2023) -
Comparative analysis between Siemens Elevator and other competitors
gan: Harun, Md Redwan Ibna
Cyhoeddwyd: (2024) -
Main elevations (Architectural Consultant Drawings)
gan: WOHA Designs PTE LTD
Cyhoeddwyd: (2023) -
Main elevations of BRAC University New Campus for RAJUK (Architectural As Built Drawings)
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2024) -
VO#054 Quotation for additional pipe works in deep tube well and planter boxes rev.00
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)