Rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project
This record consists of general correspondence regarding rework and material waste due to change of electrical pipeline construction drawing of BRAC University new campus project.
Hovedforfatter: | BUCG-ABC Joint Venture |
---|---|
Format: | General correspondence |
Sprog: | English |
Udgivet: |
Brac University
2023
|
Fag: | |
Online adgang: | http://hdl.handle.net/10361/20476 |
Lignende værker
-
Connection with City Corporation sewage pipeline
af: Brac University
Udgivet: (2023) -
PIT details of BRAC University new campus project
af: Electro-Mechanical Control Services (EMCS)
Udgivet: (2023) -
Electrical as-built drawing of BRAC University New Campus Project for RAJUK
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2024) -
Certificate for the construction materials of BRAC University new campus project
af: Brac University
Udgivet: (2023) -
Good for construction drawing of M&E punches and openings in basement of BRAC University new campus project
af: BUCG-ABC Joint Venture (BUCG-ABC JV)
Udgivet: (2023)