Removal of rebar stacked at the west of the engineer office
This record consists of general correspondence regarding the removal of rebar stacked at the west of the engineer office of BRACU new campus development project.
主要作者: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
格式: | General correspondence |
語言: | English |
出版: |
Brac University
2023
|
主題: | |
在線閱讀: | http://hdl.handle.net/10361/20430 |
相似書籍
-
Removing rebar without notice
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Regarding removing stacked materials for construction purpose
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Notice for additional works of steel sheath removal for one foundation pile
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Request for confirmation concerning valuation for cutting rebar of foundation piles
由: BUCG-ABC Joint Venture (BUCG-ABC JV)
出版: (2023) -
Resubmission of cutting hosting rebar of foundation piles
由: BUCG-ABC Joint Venture (BUCG-ABC JV)