Response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B
This record consists of general correspondence regarding the response to the engineer’s reply concerning evaluation for additional work of sharing pile work in zone B of BRACU new campus development project.
প্রধান লেখক: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
বিন্যাস: | General correspondence |
ভাষা: | English |
প্রকাশিত: |
Brac University
2023
|
বিষয়গুলি: | |
অনলাইন ব্যবহার করুন: | http://hdl.handle.net/10361/20408 |
অনুরূপ উপাদানগুলি
-
Evaluation for additional work of shoring pile work in zone B
অনুযায়ী: BUCG-ABC Joint Venture
প্রকাশিত: (2023) -
Evaluation for additional work of shoring pile work in zone B
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2023) -
Evaluation for additional work of shoring pile work between zone B
অনুযায়ী: Brac University
প্রকাশিত: (2023) -
Evaluation for additional work of sharing pile work between zone A and zone C – 05.04.18
অনুযায়ী: BUCG-ABC Joint Venture (BUCG-ABC JV)
প্রকাশিত: (2023) -
Evaluation for additional work of shoring pile work between zone A and C
অনুযায়ী: Brac University
প্রকাশিত: (2023)