Re: Regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors
This record consists of general correspondence regarding urgency to take post level survey of the building or at least near the escalator opening area in all the floors of BRACU new campus building.
المؤلف الرئيسي: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20312 |
مواد مشابهة
-
Regarding post level survey of the building or at least near the escalator opening area in all the floors
بواسطة: Brac University
منشور في: (2023) -
Re: Regarding Contractor's All Risk insurance
بواسطة: BUCG-ABC Joint Venture (BUCG-ABC JV)
منشور في: (2023) -
Adaptation of the assessment processes and its impact on learners: during and post-Covid19 situation in Bangladesh
بواسطة: Tabassum, Rezuana
منشور في: (2023) -
Reference level marking on each floor of BRAC University new campus project
بواسطة: BUCG-ABC Joint Venture
منشور في: (2023) -
Taking the Floor
بواسطة: Beunza