Cost analysis of breaking unforeseeable pile of BRAC University new campus project
This record consists of general correspondence regarding cost analysis of breaking unforeseeable pile of BRAC University new campus project.
Päätekijä: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20263 |
Samankaltaisia teoksia
-
Cost analysis of breaking unforeseeable piles of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Cost analysis of breaking unforeseeable piles
Tekijä: Brac University
Julkaistu: (2023) -
CIF cost breakdown for steel structure works of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023) -
VO #015 Proposal of bored pile works of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Integrity test for nine piles in zone A of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023)