Cost analysis of breaking unforeseeable piles of BRAC University new campus project
This record consists of general correspondence regarding cost analysis of breaking unforeseeable piles of BRAC University new campus project.
Autor principal: | BUCG-ABC Joint Venture (BUCG-ABC JV) |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/20247 |
Registros relacionados
-
Cost analysis of breaking unforeseeable pile of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Cost analysis of breaking unforeseeable piles
por: Brac University
Publicado em: (2023) -
CIF cost breakdown for steel structure works of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado em: (2023) -
VO #015 Proposal of bored pile works of BRAC University new campus project
por: BUCG-ABC Joint Venture (BUCG-ABC JV)
Publicado em: (2023) -
Integrity test for nine piles in zone A of BRAC University new campus project
por: BUCG-ABC Joint Venture
Publicado em: (2023)