Re: All the M&E design immediately to be reviewed by the Transsolar
This record consists of general correspondence regarding the reply on completing all the M&E design immediately to be reviewed by the Transsolar for BRACU new campus project.
Päätekijä: | |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20223 |