Obstacles in different floors to do the brickwork by NS Construction
This record consists of general correspondence regarding obstacles in different floors to do the brickwork by NS Construction, contractor of BRACU new campus project.
Prif Awdur: | Brac University |
---|---|
Fformat: | General correspondence |
Iaith: | English |
Cyhoeddwyd: |
Brac University
2023
|
Pynciau: | |
Mynediad Ar-lein: | http://hdl.handle.net/10361/20065 |
Eitemau Tebyg
-
Obstacles in different floors to do the brickwork by NS Construction
gan: Brac University
Cyhoeddwyd: (2023) -
Instruction to complete the ledge and brickwork as per work plan
gan: Brac University
Cyhoeddwyd: (2023) -
Instruction for commencement of brick works at toilet zone area of all floors
gan: Brac University
Cyhoeddwyd: (2023) -
To start brick works immediately
gan: Brac University
Cyhoeddwyd: (2023) -
Instruction for commencement of brick works at toilet zone area of all floors of BRAC University new campus project
gan: BUCG-ABC Joint Venture (BUCG-ABC JV)
Cyhoeddwyd: (2023)