Status of metal railing work of BRAC University new campus project
This record consists of general correspondence regarding status of metal railing work of BRAC University new campus project.
Päätekijä: | Brac University |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/20024 |
Samankaltaisia teoksia
-
Status of metal railing work
Tekijä: Brac University
Julkaistu: (2023) -
Rectifying the railing mock-up and install in the BRAC University new campus project site
Tekijä: Brac University
Julkaistu: (2023) -
Purchase order for supply & installation of MS Z-Louver railing works for the jogging track on roof for BRAC University new campus project
Tekijä: Brac University
Julkaistu: (2023) -
PE#03 Price escalation of railing works rev.00
Tekijä: BUCG-ABC Joint Venture (BUCG-ABC JV)
Julkaistu: (2023) -
Purchase order for the engagement of the designer for the design of railing and henna ceiling for BRACU new campus project
Tekijä: Brac University
Julkaistu: (2023)