Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
This record consists of general correspondence regarding the flush valve issue that caused delay of the plumbing works as well as tiling works for the bath rooms in BRACU new campus project.
Yazar: | Brac University |
---|---|
Materyal Türü: | General correspondence |
Dil: | English |
Baskı/Yayın Bilgisi: |
Brac University
2023
|
Konular: | |
Online Erişim: | http://hdl.handle.net/10361/20013 |
Benzer Materyaller
-
Replacement of the defective flush valve
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Instruction to replace all the flash valves of the WC
Yazar:: Brac University
Baskı/Yayın Bilgisi: (2023) -
Letter of flush valve replacement
Yazar:: Tillotoma Gulshan
Baskı/Yayın Bilgisi: (2023)