Replacement of the defective flush valve
This record consists of general correspondence regarding the replacement of the defective flush valve for BRACU new campus project.
Auteur principal: | Brac University |
---|---|
Format: | General correspondence |
Langue: | English |
Publié: |
Brac University
2023
|
Sujets: | |
Accès en ligne: | http://hdl.handle.net/10361/20006 |
Documents similaires
-
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
par: Brac University
Publié: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
par: Brac University
Publié: (2023) -
Instruction to replace all the flash valves of the WC
par: Brac University
Publié: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
par: Brac University
Publié: (2023) -
Letter of flush valve replacement
par: Tillotoma Gulshan
Publié: (2023)