Replacement of the defective flush valve
This record consists of general correspondence regarding the replacement of the defective flush valve for BRACU new campus project.
المؤلف الرئيسي: | Brac University |
---|---|
التنسيق: | General correspondence |
اللغة: | English |
منشور في: |
Brac University
2023
|
الموضوعات: | |
الوصول للمادة أونلاين: | http://hdl.handle.net/10361/20006 |
مواد مشابهة
-
Completion of pressure testing, rectification and replacement of the defective spare parts of the supplied and installed flush valves
بواسطة: Brac University
منشور في: (2023) -
Decision of BRACU authority about the defective flush valves supplied by Tilottoma
بواسطة: Brac University
منشور في: (2023) -
Instruction to replace all the flash valves of the WC
بواسطة: Brac University
منشور في: (2023) -
Flush valve issue causing delay of the plumbing works as well as tiling works for the bath rooms in BRACU NCP
بواسطة: Brac University
منشور في: (2023) -
Letter of flush valve replacement
بواسطة: Tillotoma Gulshan
منشور في: (2023)