Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site

This record consists of general correspondence regarding the clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by university authority and pumps delivered by the contractor at BRACU new campus project site.

Chi tiết về thư mục
Tác giả chính: Brac University
Định dạng: General correspondence
Ngôn ngữ:English
Được phát hành: Brac University 2023
Những chủ đề:
Truy cập trực tuyến:http://hdl.handle.net/10361/19995