Clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by BRAC University and pumps delivered by the contractor at project site

This record consists of general correspondence regarding the clarification needed from Patterson Pumps (the manufacturer) regarding a major difference between the pumps ordered by university authority and pumps delivered by the contractor at BRACU new campus project site.

Opis bibliograficzny
1. autor: Brac University
Format: General correspondence
Język:English
Wydane: Brac University 2023
Hasła przedmiotowe:
Dostęp online:http://hdl.handle.net/10361/19995