Rectifying the railing mock-up and install in the BRAC University new campus project site
This record consists of general correspondence regarding rectifying the railing mock-up and install in the site of BRAC University new campus project.
मुख्य लेखक: | Brac University |
---|---|
स्वरूप: | General correspondence |
भाषा: | English |
प्रकाशित: |
Brac University
2023
|
विषय: | |
ऑनलाइन पहुंच: | http://hdl.handle.net/10361/19967 |
समान संसाधन
-
Status of metal railing work of BRAC University new campus project
द्वारा: Brac University
प्रकाशित: (2023) -
Purchase order for supply & installation of MS Z-Louver railing works for the jogging track on roof for BRAC University new campus project
द्वारा: Brac University
प्रकाशित: (2023) -
Purchase order for the engagement of the designer for the design of railing and henna ceiling for BRACU new campus project
द्वारा: Brac University
प्रकाशित: (2023) -
Status of metal railing work
द्वारा: Brac University
प्रकाशित: (2023) -
Railings (Architectural Consultant Drawings)
द्वारा: WOHA Designs PTE LTD
प्रकाशित: (2023)