Observation of BRACU on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately
This record consists of general correspondence regarding the observation of BRACU new campus project on the test result and visual inspection report on the fire protection pipes and instruction to start the piping work immediately.
Príomhchruthaitheoir: | Brac University |
---|---|
Formáid: | General correspondence |
Teanga: | English |
Foilsithe / Cruthaithe: |
Brac University
2023
|
Ábhair: | |
Rochtain ar líne: | http://hdl.handle.net/10361/19872 |
Míreanna comhchosúla
-
Observation of BRACU on test result and visual inspection report on the fire protection and instruction to start work immediately
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Regarding test result as well as visual inspection report on the fire protection pipes
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Instruction to start the work at BRACU new campus project (Fire detection & fire protection)
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Instruction to start the work of fire detection & fire protection at BRACU new campus project
de réir: Brac University
Foilsithe / Cruthaithe: (2023) -
Request to release advance payment immediately upon fire protection coating
de réir: BUCG-ABC Joint Venture (BUCG-ABC JV)
Foilsithe / Cruthaithe: (2023)