VO#52: Approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure
This record consists of general correspondence regarding the approval of unit rates of non-schedule item for supplying, fabrication & installation of steel frames for RCC steps of gallery in auditorium structure of BRACU new campus building.
Autor principal: | |
---|---|
Formato: | General correspondence |
Idioma: | English |
Publicado em: |
Brac University
2023
|
Assuntos: | |
Acesso em linha: | http://hdl.handle.net/10361/19864 |