Confirmation to start manufacturing of north zone escalator from level 10 to roof (01 pair)

This record consists of general correspondence regarding the confirmation to start manufacturing of north zone escalator from level 10 to roof of BRACU new campus building.

Detaylı Bibliyografya
Yazar: Brac University
Materyal Türü: General correspondence
Dil:Spanish / Castilian
Baskı/Yayın Bilgisi: Brac University 2023
Konular:
Online Erişim:http://hdl.handle.net/10361/19755