Regarding inspection before shipment of pre-engineering steel works and components

This record consists of general correspondence regarding the inspection before shipment of pre-engineering steel works and components of BRAC University new campus project.

التفاصيل البيبلوغرافية
المؤلف الرئيسي: Brac University
التنسيق: General correspondence
اللغة:English
منشور في: Brac University 2023
الموضوعات:
الوصول للمادة أونلاين:http://hdl.handle.net/10361/19533