Setting up of testing laboratory at project site
This record consists of general correspondence regarding to set up field testing laboratory at BRAC University new campus project site.
Päätekijä: | Brac University |
---|---|
Aineistotyyppi: | General correspondence |
Kieli: | English |
Julkaistu: |
Brac University
2023
|
Aiheet: | |
Linkit: | http://hdl.handle.net/10361/19527 |
Samankaltaisia teoksia
-
Rectifying the railing mock-up and install in the BRAC University new campus project site
Tekijä: Brac University
Julkaistu: (2023) -
Regarding site cleaning, keeping healthy environment at the BRACU project site
Tekijä: Brac University
Julkaistu: (2023) -
Suggestion about structure pile test
Tekijä: Brac University
Julkaistu: (2023) -
Regarding site cleaning, keeping healthy environment at the BRAC University project site
Tekijä: Brac University
Julkaistu: (2023) -
Integrity test for nine piles in zone A of BRAC University new campus project
Tekijä: BUCG-ABC Joint Venture
Julkaistu: (2023)