Seventh Periodic Monitoring Report on the Status of Implementation Plans in Response to Board-Endorsed IEO Recommendations.

The Seventh PMR includes: (i) a discussion of progress made over the last year on the actions corresponding to four Management Implementation Plans (MIPs) that were classified as still 'in progress' in the previous PMR; and (ii) an assessment of the progress made in achieving the high-leve...

Mô tả đầy đủ

Chi tiết về thư mục
Tác giả của công ty: International Monetary Fund
Định dạng: Tạp chí
Ngôn ngữ:English
Được phát hành: Washington, D.C. : International Monetary Fund, 2015.
Loạt:Policy Papers; Policy Paper ; No. 2015/019
Truy cập trực tuyến:Full text available on IMF
LEADER 01879cas a2200241 a 4500
001 AALejournalIMF020550
008 230101c9999 xx r poo 0 0eng d
020 |c 5.00 USD 
020 |z 9781498344234 
022 |a 2663-3493 
040 |a BD-DhAAL  |c BD-DhAAL 
110 2 |a International Monetary Fund. 
245 1 0 |a Seventh Periodic Monitoring Report on the Status of Implementation Plans in Response to Board-Endorsed IEO Recommendations. 
264 1 |a Washington, D.C. :  |b International Monetary Fund,  |c 2015. 
300 |a 1 online resource (58 pages) 
490 1 |a Policy Papers 
500 |a <strong>Off-Campus Access:</strong> No User ID or Password Required 
500 |a <strong>On-Campus Access:</strong> No User ID or Password Required 
506 |a Electronic access restricted to authorized BRAC University faculty, staff and students 
520 3 |a The Seventh PMR includes: (i) a discussion of progress made over the last year on the actions corresponding to four Management Implementation Plans (MIPs) that were classified as still 'in progress' in the previous PMR; and (ii) an assessment of the progress made in achieving the high-level objectives in three areas directly related to those MIPs. In addition, an update on substantive issues related to five older MIPs agreed since 2007 is provided at the end of the report. Three new evaluations have been completed by the IEO since March 2014. In July and August 2015, Management issued the MIPs in response to these evaluations. Given that only a short time has passed since their completion, progress in addressing the actions contemplated in those MIPs will be discussed in the next PMR. 
538 |a Mode of access: Internet 
830 0 |a Policy Papers; Policy Paper ;  |v No. 2015/019 
856 4 0 |z Full text available on IMF  |u http://elibrary.imf.org/view/journals/007/2015/019/007.2015.issue-019-en.xml  |z IMF e-Library