Fifth Periodic Monitoring Report on the Status of Implementation Plans in Response to Board-Endorsed IEO Recommendations.

Periodic Monitoring Reports update the status on Management Implementation Plans (MIPs) in response to Executive Board-endorsed IEO recommendations. The last Periodic Monitoring Report (PMR) was discussed by the Board Evaluation Committee (EVC) and then agreed by the Board in August 2011. That repor...

Ausführliche Beschreibung

Bibliographische Detailangaben
Körperschaft: International Monetary Fund
Format: Zeitschrift
Sprache:English
Veröffentlicht: Washington, D.C. : International Monetary Fund, 2012.
Schriftenreihe:Policy Papers; Policy Paper ; No. 2012/083
Schlagworte:
Online Zugang:Full text available on IMF
LEADER 02455cas a2200301 a 4500
001 AALejournalIMF020286
008 230101c9999 xx r poo 0 0eng d
020 |c 5.00 USD 
020 |z 9781498339834 
022 |a 2663-3493 
040 |a BD-DhAAL  |c BD-DhAAL 
110 2 |a International Monetary Fund. 
245 1 0 |a Fifth Periodic Monitoring Report on the Status of Implementation Plans in Response to Board-Endorsed IEO Recommendations. 
264 1 |a Washington, D.C. :  |b International Monetary Fund,  |c 2012. 
300 |a 1 online resource (48 pages) 
490 1 |a Policy Papers 
500 |a <strong>Off-Campus Access:</strong> No User ID or Password Required 
500 |a <strong>On-Campus Access:</strong> No User ID or Password Required 
506 |a Electronic access restricted to authorized BRAC University faculty, staff and students 
520 3 |a Periodic Monitoring Reports update the status on Management Implementation Plans (MIPs) in response to Executive Board-endorsed IEO recommendations. The last Periodic Monitoring Report (PMR) was discussed by the Board Evaluation Committee (EVC) and then agreed by the Board in August 2011. That report concluded that all key performance benchmarks related to the MIPs covered in that report had either been met or were on track for timely completion, that no new remedial actions were proposed, and that there were no outstanding performance benchmarks to be reviewed in the next PMR. In their assessment to the Executive Board, the EVC did, however, note that further work was needed on three other issues-staff mobility, enhanced coverage of previous implementation plans, and the process for following up on IEO recommendations. This fifth report therefore updates work on these three issues, including a consolidated picture of recent progress on all Board-endorsed recommendations made since the first PMR in 2007. This PMR also presents progress on the Implementation Plan in response to Board-endorsed recommendations arising from the IEO Evaluation of IMF Interactions with Member Countries (hereafter, Interactions Evaluation). 
538 |a Mode of access: Internet 
650 7 |a Exchange Rate  |2 imf 
650 7 |a Fund  |2 imf 
650 7 |a IEO  |2 imf 
650 7 |a PP  |2 imf 
650 7 |a Staff  |2 imf 
830 0 |a Policy Papers; Policy Paper ;  |v No. 2012/083 
856 4 0 |z Full text available on IMF  |u http://elibrary.imf.org/view/journals/007/2012/083/007.2012.issue-083-en.xml  |z IMF e-Library