Technical Assistance Evaluation Program : Findings of Evaluations and Updated Program.

Key Messages -- The Iraq Subaccount is a good example of donor coordination as expressed in the Paris Declaration. -- Overall, the TAs funded from the Iraq TA Subaccount were successful, relevant, efficient and effective. -- Ensuring long-term sustainability requires maintaining an adequate the leve...

ver descrição completa

Detalhes bibliográficos
Autor Corporativo: International Monetary Fund
Formato: Periódico
Idioma:English
Publicado em: Washington, D.C. : International Monetary Fund, 2008.
Colecção:Policy Papers; Policy Paper ; No. 2008/023
Acesso em linha:Full text available on IMF
LEADER 02326cas a2200241 a 4500
001 AALejournalIMF019838
008 230101c9999 xx r poo 0 0eng d
020 |c 5.00 USD 
020 |z 9781498334754 
022 |a 2663-3493 
040 |a BD-DhAAL  |c BD-DhAAL 
110 2 |a International Monetary Fund. 
245 1 0 |a Technical Assistance Evaluation Program :   |b Findings of Evaluations and Updated Program. 
264 1 |a Washington, D.C. :  |b International Monetary Fund,  |c 2008. 
300 |a 1 online resource (168 pages) 
490 1 |a Policy Papers 
500 |a <strong>Off-Campus Access:</strong> No User ID or Password Required 
500 |a <strong>On-Campus Access:</strong> No User ID or Password Required 
506 |a Electronic access restricted to authorized BRAC University faculty, staff and students 
520 3 |a Key Messages -- The Iraq Subaccount is a good example of donor coordination as expressed in the Paris Declaration. -- Overall, the TAs funded from the Iraq TA Subaccount were successful, relevant, efficient and effective. -- Ensuring long-term sustainability requires maintaining an adequate the level of TA activity in the future. -- There were instances where more pro-active donor coordination was needed to build synergies to achieve development results. -- While the offsite modality was fairly effective and cost efficient and delivered value for money, the limits of this model will be stretched as IMF moves from policy and operational advice and training to greater emphasis on supporting the implementation of policies and procedures. -- The Fund's internal monitoring needs to be strengthened, particularly the TA Information Management System. Reforms in this area are on track, supported by Fund management, and improvements are expected by 1 May 2008. -- The Fund's TA evaluation framework needs to be strengthened by instituting a system of self assessments of all completed TAs and developing guidelines for the ex-post evaluation of TAs. Work in these areas is planned. -- The Fund delivered slightly more internally funded TA to Iraq than originally planned. 
538 |a Mode of access: Internet 
830 0 |a Policy Papers; Policy Paper ;  |v No. 2008/023 
856 4 0 |z Full text available on IMF  |u http://elibrary.imf.org/view/journals/007/2008/023/007.2008.issue-023-en.xml  |z IMF e-Library