Montenegro : Selected Issues.
This paper discusses the first phase, to be constructed from 2015 to mid-2019, comprises a 41-kilometer section that is to provide an efficient and safe transport link between Podgorica and the poorest northern region in Montenegro. It runs through the mountainous terrain in the center of the countr...
| Corporate Author: | |
|---|---|
| Format: | Journal |
| Language: | English |
| Published: |
Washington, D.C. :
International Monetary Fund,
2017.
|
| Series: | IMF Staff Country Reports; Country Report ;
No. 2017/277 |
| Online Access: | Full text available on IMF |
| Summary: | This paper discusses the first phase, to be constructed from 2015 to mid-2019, comprises a 41-kilometer section that is to provide an efficient and safe transport link between Podgorica and the poorest northern region in Montenegro. It runs through the mountainous terrain in the center of the country that is economically undeveloped. Due to its large cost (25 percent of 2017 GDP), the first phase of the highway has used up most of Montenegro's fiscal space and will crowd out other productive spending. For the foreseeable future, the second and third parts of the highway could only be financed with concessional funds, because loans would destabilize the debt sustainability of Montenegro. The government's main motivation for this large project is the need to improve connectivity, particularly to Europe through Serbia, boost tourism and trade, improve road safety, and strengthen national security. The highway is a part of Montenegro's plans to integrate the Montenegrin transport network with those of neighboring countries. |
|---|---|
| Item Description: | <strong>Off-Campus Access:</strong> No User ID or Password Required <strong>On-Campus Access:</strong> No User ID or Password Required |
| Physical Description: | 1 online resource (102 pages) |
| Format: | Mode of access: Internet |
| ISSN: | 1934-7685 |
| Access: | Electronic access restricted to authorized BRAC University faculty, staff and students |