Ghana : First Review Under the Extended Credit Facility Arrangement and Request for Waiver and Modifications of Performance Criteria.

This paper discusses Ghana's First Review Under the Extended Credit Facility Arrangement and Request for Waiver and Modifications of Performance Criteria (PC). Program performance has been broadly satisfactory. All but one PC were met at end-April 2015 and structural benchmarks were largely com...

Celý popis

Podrobná bibliografie
Korporativní autor: International Monetary Fund. African Dept
Médium: Časopis
Jazyk:English
Vydáno: Washington, D.C. : International Monetary Fund, 2015.
Edice:IMF Staff Country Reports; Country Report ; No. 2015/245
On-line přístup:Full text available on IMF
LEADER 01885cas a2200241 a 4500
001 AALejournalIMF015483
008 230101c9999 xx r poo 0 0eng d
020 |c 5.00 USD 
020 |z 9781513596365 
022 |a 1934-7685 
040 |a BD-DhAAL  |c BD-DhAAL 
110 2 |a International Monetary Fund.  |b African Dept. 
245 1 0 |a Ghana :   |b First Review Under the Extended Credit Facility Arrangement and Request for Waiver and Modifications of Performance Criteria. 
264 1 |a Washington, D.C. :  |b International Monetary Fund,  |c 2015. 
300 |a 1 online resource (101 pages) 
490 1 |a IMF Staff Country Reports 
500 |a <strong>Off-Campus Access:</strong> No User ID or Password Required 
500 |a <strong>On-Campus Access:</strong> No User ID or Password Required 
506 |a Electronic access restricted to authorized BRAC University faculty, staff and students 
520 3 |a This paper discusses Ghana's First Review Under the Extended Credit Facility Arrangement and Request for Waiver and Modifications of Performance Criteria (PC). Program performance has been broadly satisfactory. All but one PC were met at end-April 2015 and structural benchmarks were largely completed, some with delays. However, there was nonobservance of the continuous PC on the ceiling on gross credit to government by Bank of Ghana in April by a small margin and the indicative targets on inflation and social protection spending were missed, the latter because of a very slight delay in some spending. The economic environment remains challenging and risks are tilted to the downside. The IMF staff recommends completion of the first review. 
538 |a Mode of access: Internet 
830 0 |a IMF Staff Country Reports; Country Report ;  |v No. 2015/245 
856 4 0 |z Full text available on IMF  |u http://elibrary.imf.org/view/journals/002/2015/245/002.2015.issue-245-en.xml  |z IMF e-Library