Guinea : Second Review Under the Three-Year Arrangement Under the Extended Credit Facility, Requests for Waiver of Nonobservance and Modification of Performance Criterion, and Financing Assurances Review.

This paper discusses Guinea's Second Review Under the Three-Year Arrangement under the Extended Credit Facility, Requests for Modifications of Performance Criteria and Waiver of Nonobservance of Performance Criterion, and Financing Assurances. Growth is projected at 4.5 percent for 2013, slight...

Descrizione completa

Dettagli Bibliografici
Ente Autore: International Monetary Fund. African Dept
Natura: Periodico
Lingua:English
Pubblicazione: Washington, D.C. : International Monetary Fund, 2013.
Serie:IMF Staff Country Reports; Country Report ; No. 2013/192
Accesso online:Full text available on IMF
LEADER 02017cas a2200241 a 4500
001 AALejournalIMF013709
008 230101c9999 xx r poo 0 0eng d
020 |c 5.00 USD 
020 |z 9781484390375 
022 |a 1934-7685 
040 |a BD-DhAAL  |c BD-DhAAL 
110 2 |a International Monetary Fund.  |b African Dept. 
245 1 0 |a Guinea :   |b Second Review Under the Three-Year Arrangement Under the Extended Credit Facility, Requests for Waiver of Nonobservance and Modification of Performance Criterion, and Financing Assurances Review. 
264 1 |a Washington, D.C. :  |b International Monetary Fund,  |c 2013. 
300 |a 1 online resource (97 pages) 
490 1 |a IMF Staff Country Reports 
500 |a <strong>Off-Campus Access:</strong> No User ID or Password Required 
500 |a <strong>On-Campus Access:</strong> No User ID or Password Required 
506 |a Electronic access restricted to authorized BRAC University faculty, staff and students 
520 3 |a This paper discusses Guinea's Second Review Under the Three-Year Arrangement under the Extended Credit Facility, Requests for Modifications of Performance Criteria and Waiver of Nonobservance of Performance Criterion, and Financing Assurances. Growth is projected at 4.5 percent for 2013, slightly lower than envisaged because of lower growth in the mining sector. The programs inflation target has been revised upward slightly, mainly reflecting the higher than programmed outcome at end-2012, together with some modest impact from an agreement on increases in civil service wages. Key risks include continued political unrest in the run-up to elections, which could affect growth, investment, and reform momentum, and a rebound in inflation if the private sector follows the increase in civil service wages. 
538 |a Mode of access: Internet 
830 0 |a IMF Staff Country Reports; Country Report ;  |v No. 2013/192 
856 4 0 |z Full text available on IMF  |u http://elibrary.imf.org/view/journals/002/2013/192/002.2013.issue-192-en.xml  |z IMF e-Library