Republic of Congo : Fifth and Sixth Reviews Under the Three-Year Arrangement Under the Extended Credit Facility and Financing Assurances Review: Staff Report; Staff Statement and Supplement; Press Release on the Executive Board Discussion; and Statement by the Executive Director for the Republic of Congo.

In this study, macroeconomic development, its performance, and outlook are reviewed. Narrowing of the infrastructure gap and public financial management (PFM) are focused to safeguard investment quality. Fiscal reform has been introduced to improve the design of the tax system and to strengthen fisc...

Descrición completa

Detalles Bibliográficos
Autor Corporativo: International Monetary Fund
Formato: Revista
Idioma:English
Publicado: Washington, D.C. : International Monetary Fund, 2011.
Series:IMF Staff Country Reports; Country Report ; No. 2011/255
Acceso en liña:Full text available on IMF
LEADER 01798cas a2200241 a 4500
001 AALejournalIMF011247
008 230101c9999 xx r poo 0 0eng d
020 |c 5.00 USD 
020 |z 9781462341566 
022 |a 1934-7685 
040 |a BD-DhAAL  |c BD-DhAAL 
110 2 |a International Monetary Fund. 
245 1 0 |a Republic of Congo :   |b Fifth and Sixth Reviews Under the Three-Year Arrangement Under the Extended Credit Facility and Financing Assurances Review: Staff Report; Staff Statement and Supplement; Press Release on the Executive Board Discussion; and Statement by the Executive Director for the Republic of Congo. 
264 1 |a Washington, D.C. :  |b International Monetary Fund,  |c 2011. 
300 |a 1 online resource (66 pages) 
490 1 |a IMF Staff Country Reports 
500 |a <strong>Off-Campus Access:</strong> No User ID or Password Required 
500 |a <strong>On-Campus Access:</strong> No User ID or Password Required 
506 |a Electronic access restricted to authorized BRAC University faculty, staff and students 
520 3 |a In this study, macroeconomic development, its performance, and outlook are reviewed. Narrowing of the infrastructure gap and public financial management (PFM) are focused to safeguard investment quality. Fiscal reform has been introduced to improve the design of the tax system and to strengthen fiscal institutions that the FAD technical assistance (TA) mission introduced. A comprehensive action plan has been introduced to improve the business climate. The outstanding debt issues are being resolved. 
538 |a Mode of access: Internet 
830 0 |a IMF Staff Country Reports; Country Report ;  |v No. 2011/255 
856 4 0 |z Full text available on IMF  |u http://elibrary.imf.org/view/journals/002/2011/255/002.2011.issue-255-en.xml  |z IMF e-Library